Article ; Online: A novel gear RUL prediction method by diffusion model generation health index and attention guided multi-hierarchy LSTM.
2024 Volume 14, Issue 1, Page(s) 1795
Abstract: Gears, as indispensable components of machinery, demand accurate prediction of their Remaining Useful Life (RUL). To enhance the utilization of ordered information within time series data and elevate RUL prediction precision, this study introduces the ... ...
Abstract | Gears, as indispensable components of machinery, demand accurate prediction of their Remaining Useful Life (RUL). To enhance the utilization of ordered information within time series data and elevate RUL prediction precision, this study introduces the attention-guided multi-hierarchy LSTM (AGMLSTM). This innovative approach leverages attention mechanisms to capture the intricate interplay between high and low hierarchical features of the input data, marking the first application of such a technique in gear RUL prediction. Additionally, a refined health indicator (HI) is introduced, constructed through a diffusion model, to precisely reflect the gears' health condition. The proposed RUL prediction method unfolds as follows: firstly, HIs are computed from gear vibration data. Subsequently, leveraging the known HIs, AGMLSTM predicts future HIs, and the RUL of the gear is determined upon surpassing the failure threshold. Quantitative analysis of experimental results conclusively demonstrates the superiority of the proposed RUL prediction method over existing approaches for gear RUL estimation. |
---|---|
Language | English |
Publishing date | 2024-01-20 |
Publishing country | England |
Document type | Journal Article |
ZDB-ID | 2615211-3 |
ISSN | 2045-2322 ; 2045-2322 |
ISSN (online) | 2045-2322 |
ISSN | 2045-2322 |
DOI | 10.1038/s41598-024-52151-y |
Database | MEDical Literature Analysis and Retrieval System OnLINE |
More links
Kategorien
Order via subito
This service is chargeable due to the Delivery terms set by subito. Orders including an article and supplementary material will be classified as separate orders. In these cases, fees will be demanded for each order.