Article ; Online: The status of new fragment separator ACCULINNA-2 project and the first day experiments
EPJ Web of Conferences, Vol 66, p
2014 Volume 11021
Abstract: The new facility fragment separator ACCULINNA-2 will be put into operation at the beginning of 2015 in FLNR JINR. The new separator is destined to add considerably to the studies of drip-line nuclei performed with the use of variety of direct reactions ... ...
Abstract | The new facility fragment separator ACCULINNA-2 will be put into operation at the beginning of 2015 in FLNR JINR. The new separator is destined to add considerably to the studies of drip-line nuclei performed with the use of variety of direct reactions known to be distinctive to the 15 – 50 MeV/amu exotic secondary RIBs. Intense beams provided by the U-400M cyclotron will ensure the achievement of this objective. In addition to the RIB separation accomplished by means of the dipole-wedge-dipole selection, the addition of a zero-degree dipole magnet setup is foreseen. A long (13 m) straight section will provide precise time-of-flight measurements. |
---|---|
Keywords | Physics ; QC1-999 ; Science ; Q |
Language | English |
Publishing date | 2014-03-01T00:00:00Z |
Publisher | EDP Sciences |
Document type | Article ; Online |
Database | BASE - Bielefeld Academic Search Engine (life sciences selection) |
Full text online
More links
Kategorien
Inter-library loan at ZB MED
Your chosen title can be delivered directly to ZB MED Cologne location if you are registered as a user at ZB MED Cologne.