Artikel ; Online: The status of new fragment separator ACCULINNA-2 project and the first day experiments
EPJ Web of Conferences, Vol 66, p
2014 Band 11021
Abstract: The new facility fragment separator ACCULINNA-2 will be put into operation at the beginning of 2015 in FLNR JINR. The new separator is destined to add considerably to the studies of drip-line nuclei performed with the use of variety of direct reactions ... ...
Abstract | The new facility fragment separator ACCULINNA-2 will be put into operation at the beginning of 2015 in FLNR JINR. The new separator is destined to add considerably to the studies of drip-line nuclei performed with the use of variety of direct reactions known to be distinctive to the 15 – 50 MeV/amu exotic secondary RIBs. Intense beams provided by the U-400M cyclotron will ensure the achievement of this objective. In addition to the RIB separation accomplished by means of the dipole-wedge-dipole selection, the addition of a zero-degree dipole magnet setup is foreseen. A long (13 m) straight section will provide precise time-of-flight measurements. |
---|---|
Schlagwörter | Physics ; QC1-999 ; Science ; Q |
Sprache | Englisch |
Erscheinungsdatum | 2014-03-01T00:00:00Z |
Verlag | EDP Sciences |
Dokumenttyp | Artikel ; Online |
Datenquelle | BASE - Bielefeld Academic Search Engine (Lebenswissenschaftliche Auswahl) |
Volltext online
Zusatzmaterialien
Kategorien
Fernleihe an ZB MED
Sie können sich den gewünschten Titel als lokale Nutzerin oder lokaler Nutzer von ZB MED direkt an den Standort Köln schicken lassen.