Article ; Online: Influence of Oxygen Uptake on Pitch Carbon Fiber.
Small (Weinheim an der Bergstrasse, Germany)
2023 Volume 19, Issue 45, Page(s) e2303527
Abstract: Carbon fiber precursor materials, such as polyacrylonitrile, pitch, and cellulose/rayon, require thermal stabilization to maintain structural integrity during conversion into carbon fiber. Thermal stabilization mitigates undesirable decomposition and ... ...
Abstract | Carbon fiber precursor materials, such as polyacrylonitrile, pitch, and cellulose/rayon, require thermal stabilization to maintain structural integrity during conversion into carbon fiber. Thermal stabilization mitigates undesirable decomposition and liquification of the fibers during the carbonization process. Generally, the thermal stabilization of mesophase pitch consists of the attachment of oxygen-containing functional groups onto the polymeric structure. In this study, the oxidation of mesophase pitch precursor fibers at various weight percentage increases (1, 3.5, 5, 7.5 wt%) and temperatures (260, 280, 290 °C) using in situ differential scanning calorimetry and thermogravimetric analysis is investigated. The results are analyzed to determine the effect of temperature and weight percentage increase on the stabilization process of the fibers, and the fibers are subsequently carbonized and tested for tensile mechanical performance. The findings provide insight into the relationship between stabilization conditions, fiber microstructure, and mechanical properties of the resulting carbon fibers. |
---|---|
Language | English |
Publishing date | 2023-07-07 |
Publishing country | Germany |
Document type | Journal Article |
ZDB-ID | 2168935-0 |
ISSN | 1613-6829 ; 1613-6810 |
ISSN (online) | 1613-6829 |
ISSN | 1613-6810 |
DOI | 10.1002/smll.202303527 |
Database | MEDical Literature Analysis and Retrieval System OnLINE |
Full text online
More links
Kategorien
Order via subito
This service is chargeable due to the Delivery terms set by subito. Orders including an article and supplementary material will be classified as separate orders. In these cases, fees will be demanded for each order.